BETTER THAN NEW! 2014 Built LOADED with STYLISH Upgrades. This is THE ONE! No construction delay headaches. MOVE-IN READY! $278,900 9912 PRONGHORN ROAD MCKINNEY, TX

13349921-1.jpg

13349921-2

$278,900 9912 PRONGHORN ROAD MCKINNEY, TX

MLS: 13349921   Type: Single Family   County: Collin   City: Mckinney   Area: Frisco   Neighborhood: Fossil Creek At Westridge #1   Zip: 75071   Style: Traditional     Stories: 2   Taxes: $5,992

BEDS

BATHS

HALF BATHS

SQR FOOTAGE

LOT SIZE

BUILT

3

2

1

2,031

4,356

2014

BETTER THAN NEW! 2014 Built LOADED with STYLISH Upgrades. This is THE ONE! No construction delay headaches. MOVE-IN READY! Just the perfect size with 3 Bedrooms,2.5 Bathrooms with framed mirrors and upgraded tile, LUXURIOUS WOOD FLOORS, Rich Kitchen cabinets with unbelievable space, GORGEOUS GRANITE, surround sound pre-wire, Massive Master Retreat for ultimate privacy, radiant barrier-lower utility bills,private backyard & more.Hurry, this one sparkles!

ELEMENTARY SCHOOL

MIDDLE SCHOOL

HIGH SCHOOL

Judy Rucker
Distance: 3.22 Miles
Rogers
Distance: 1.59 Miles
Prosper
Distance: 4.7 Miles

PRICE HISTORY

4/2/2016 Listed $283,500
4/11/2016 2% – $278,900

Association Fee Frequency Annual
Association Type Mandatory
Block A
Energy Saving Features 12 inch+ Attic Insulation, 13-15 SEER AC, Ceiling Fans, Double Pane Windows, Energy Star Appliances, Gas Water Heater, Low E Windows, Programmable Thermostat, Radiant Barrier
HOA Fee 300
HOA Fee Includes Full Use of Facilities, Maintenance of Common Areas, Management Fees
Handicap Access 0
Listing Area FRISCO / DENTON COUNTY EAST AREA (55)
Lot Number 33
Other Equipment Built-in Microwave, Cooktop – Gas, Dishwasher, Disposal, Plumbed For Gas in Kitchen, Vent Mechanism, Water Line to Refrigerator
Property Type Residential
School District Prosper ISD
School Name Judy Rucker
Sub Area FRISCO (1)
Transaction Type For Sale
Type RES-Single Family
Year Built Details Preowned

INTERIOR FEATURES

Fireplace Wood Burning
Fireplaces Total 1
Flooring Carpet, Ceramic Tile, Wood
Heating Central Air-Elec, Central Heat-Gas
Interior Features Cable TV Available, Decorative Lighting, Flat Screen Wiring, High Speed Internet Available, Loft, Sound System Wiring, Window Coverings
Number Of Dining Areas 1
Number Of Living Areas 1
Room Count 0
Security System Yn 1
Sq Ft Total 2031

EXTERIOR FEATURES

Construction Materials Brick
Exterior Covered Porch(es), Gutters, Patio Open, Sprinkler System
Fencing Wood
Foundation Details Slab
Garage Depth 20
Garage Width 20
Lot Interior Lot, Landscaped, Lrg. Backyard Grass, Some Trees, Subdivision
Lot Area Less Than .5 Acre (not Zero)
Lot Size Area 0.102
Lot Size Area (acres) 0.102
Lot Size Area (sq Ft) 4443
Lot Size Units Acres
Parking Features Attached, Front, Garage, Garage Door Opener
Parking Spaces Carport 0
Parking Spaces Covered Total 2
Parking Spaces Garage 2
Pool 0
Structural Style Single Detached
Style Traditional

Like us on Facebook: The Kimberly Davis Group

Fresh Listings! Just listed Mckinney Area! Don’t miss out!

Want to know the value of your home?  Click here: Find Your Homes Value Now For FREE.

Want to learn more information about a specific property?  Click here: The Kimberly Davis Group-Looking to Buy or Sell… The Kimberly Davis Group is ranked #1!

Advertisements

Leave a comment

Filed under Frisco, Home Buyer, Home for Sale, Home Listings, kimberly davis group, little elm, McKinney, north Texas homes for sale, plano, Providence Village, the colony homes for sale, TX, Uncategorized

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

w

Connecting to %s